Presidium
Enterprise Construction Lending Platform

$165B+Portfolio Assets Under Management
25K+Field Inspections Annually
75%Administrative Capacity Gain
Platform Capabilities — Key Modules
Click any module to explore features & lifecycle stage

Why It Matters
Construction Loan Lifecycle
Supported Lending Structures & Asset Classes

Select an asset class to explore associated modules & screenshots

R Draw Inspection Workflow
About Presidium & CodeFi Solutions
Stage 01 — Pre-Closing

Establish governance before the first draw is submitted.

Lender-defined workflow governance: role-based permission structures, multi-step approval routing, trigger-based correspondence automation, and configurable loan-type checklists — mapped to your institution’s credit policy,

Pre-Closing Modules

Plan & Cost Review

Independent engineering report analysis, construction cost specification review, and pre-close risk validation.

Plan ReviewCost AnalysisRisk Validation
Budget Configuration

Line-level budget architecture for Commercial, Per-Unit Residential, and Revolving credit structures.

Line LevelPer-UnitSources & Uses
Document Intake & Repository

Hierarchical document architecture with institution-defined intake checklists and role-based access controls.

Doc ChecklistsFolder StructureSecure Exchange
Risk & Compliance Configuration

Institution-defined exception rules, automated tickler routing, and red flag thresholds configured before first funding.

TicklersRed FlagsAlert Config
Policy & Workflow Governance

Lender-defined workflow governance: role-based permissions, multi-step approval routing, and configurable loan-type checklists.

WorkflowsPermissionsTemplates
Collateral & Project Setup

Collateral pool configuration for residential inventory, commercial structures, and revolving credit facilities.

Collateral PoolsProject ConfigRevolving
01 02 03
Stage 03 — Audit, Reporting & Compliance

Controlled disbursement. Immutable audit record. Clean close-out.

Audit, Reporting & Compliance Modules

Final Funding

Budget-vs-draw validation at every disbursement — prevents over-funding through payoff.

Budget ValidationDisbursement Control
Approval Workflows

Multi-step approval chains with two-touch controls — role-logged and immutable.

Two-TouchAudit Log
Core Banking & DDA

Draw approvals trigger automated DDA, wire, or cashier check payments — straight-through, 24/7 client access.

JUNK-X-ANCHOR’s core banking infrastructure — draw approvals trigger automated DDA payment execution to borrower-verified accounts. Supports DDA, wire, and cashier’s check disbursement methods with 24/7 client access and straight-through processing.

DDA IntegrationStraight-Through
Audit Trail

Tamper-proof audit log — user, role, timestamp at every action. Examination-ready.

Immutable LogExam-Ready
Compliance Reporting

20+ audit-ready reports — portfolio, budget, disbursement, risk analytics. Excel export.

20+ ReportsExcel Export
Loan Close-Out

Payoff demands, compliance certificates, and document retention — clean close file.

Close-OutCorrespondence
01 02 03
Standardized Draw Inspection Workflow

Order inspections.
Standardize execution.

A centralized inspection ordering engine that automates assignment, scheduling, and fulfillment across internal teams and external vendors. Integrates directly with Presidium draw administration.

Marketplace Fulfillment Direct Request AI-Assisted
60%
Inspection Time Reduced
Automated scheduling and workflow coordination supports faster turnaround across the inspection cycle.
<1 min
Workflow Configuration
Inspection workflow setup — including fulfillment model, triggers, and escalation rules — configurable in under one minute.
99%
Manual Errors Eliminated
Automated assignment, scheduling, and notification removes the manual coordination that creates errors and delays.
AI-Assisted Operations
The RAZE AI assistant helps teams create projects, order inspections, and resolve missing details with address auto-completion and workflow-aware recommendations.
Centralized Workspace
One workspace for every inspection, client, and team. Manage multiple clients, projects, and field teams — all in one system. Replaces disconnected emails, texts, and file folders.
Photos, Notes & One-Click Reports
Capture and organize field data with automatic geo-tagging and job association. Compile into standardized, client-ready reports in seconds — no manual formatting or rework.
Smart Territory Management
Visual route planning with all assigned inspections on an interactive map. Jobs surface based on urgency, deadlines, or status. Filter by client, project type, or inspector.
Automated Invoicing & Payouts
Fees tracked per job, status visible in real time, payouts processed automatically once work is approved. No manual entry. No chasing approvals. Enterprise-grade security built in.
Native iOS & Android
Available on App Store and Google Play. Construction progress photos, condition observations, and completion notes captured natively — no third-party apps required.
Geo-Tagged & Time-Stamped
Every photo and observation is automatically geo-tagged and time-stamped at capture — creating verifiable, location-confirmed field evidence associated with the correct draw.
Offline-Ready Field Operation
App supports offline capture when on-site connectivity is limited. Data syncs automatically on reconnect. No inspection delayed or lost due to signal issues.
Standardized Report Generation
Field evidence compiled into standardized, lender-ready inspection reports. One-click generation from completed field submission — delivered to the lender and Presidium automatically.
60%Inspection Time Reduced via Ordering Engine
25,000+Draw Inspections Processed Annually
99%Manual Coordination Errors Eliminated
01 02 03 R
Team
Bob Scales
Bob Scales
Co-Founder & Managing Director
Codefi Solutions
Larry Buckley
Larry Buckley
Co-Founder
Codefi Solutions
Chien Hsiung
Chien Hsiung
Co-Founder & Chief Technical Officer
Codefi Solutions
Dave Hickson
Dave Hickson
Co-Founder
Codefi Solutions
Rick Blaylock
Rick Blaylock
Director of Corporate Development
Presidium
Mike Marshner
Mike Marshner
Co-Founder & CEO
RAZE
Rekha Jadhav
Rekha Jadhav
Sr. Applications Support Manager
Presidium & RAZE
Michele Hawkins
Michele Hawkins
Director of Professional Services
Presidium
Lauren Jones
Lauren Jones
National Sales Partner
Presidium & RAZE
Cole Bergstrom
Cole Bergstrom
Senior Platform Manager
Presidium & RAZE
Sean Hawkins
Sean Hawkins
Senior Engineer
Presidium
Blair Perez
Director of Client Support
Presidium
Pramod Jadhav
Senior Engineer
Presidium
Joseph Virtucio
Senior Engineer
Presidium
Sonia Doo-Kingue
Office Manager
Presidium
Key Metrics

Proven at scale. Results lenders measure.

Platform performance across $165B+ in construction loan assets — from draw one to final disbursement.

$165B+
Construction Assets Under Management
Across Top 25, Top 50 regional banks & credit unions
1M+
Draw Transactions Processed
Full audit trail on every transaction, every loan
25,000+
Field Inspections per Year
1.1-day average turnaround via RAZE Field Layer
75%
Administrative Capacity Gain
Workflow automation vs. legacy manual operations
Top 50 Regional Bank
$1.05M
Additional interest income in 2024 — from accelerated draw processing and maximized interest earnings
330 inspections / month
Top 25 National Bank
$700K
Administrative savings — $1,100 per project eliminated through workflow automation
Straight-through draw processing
Top 25 National Bancorp
76%
Corporate time savings — 7 institutions across 5 states standardized on one platform
Full compliance automation
FinTech Bank — Residential
$280M
Total disbursements managed in 2024 — $1.12M per operating day across active projects
4,006 inspections · 79,173 user actions
1.1days
Avg. Inspection Turnaround
RAZE field inspections returned and integrated into draw workflow in under 30 hours — nationwide coverage
30+rules
Exception Rule Types
Insurance expiry, payment discrepancies, funding shortfalls, missing docs — continuous monitoring on every active loan
48LPOs
Loan Production Offices Standardized
Single platform eliminated operational inconsistencies across 48 loan production offices at a $43B bancorp
24/7
Straight-Through Processing
DDA-linked draw triggers execute automatically — no manual wire requests, no dual-entry, no settlement lag
20+reports
Compliance Reports On-Demand
Portfolio, budget, disbursement, and risk analytics — exam-ready with Excel export, no manual assembly
100%
Construction Lending Focus
Purpose-built exclusively for CLA — not a generic LOS. No retrofitting. No compromises on workflow or audit.
Market Problem
Most lenders still run construction draws on email & spreadsheets
Growing Risk
Audits, litigation & fraud increasing across construction portfolios
Presidium Advantage
Immutable audit trail + real-time exception monitoring on every loan, every draw
Client Tenure
Partners since 2016 — $43B bancorp still live & expanding